How much will the renovation really cost?

Not “square metres × a random price” but a transparent cost estimate: enter the areas, the types of work and your own prices for materials and labour, and the calculator works out materials, labour, fixed costs and contingency separately and shows what share of this cost estimate your budget covers.

Estimate Formula shown Your data stays in your browser

Your data

1. Base areas

The areas from which the floor, wall and ceiling works are calculated.

The total for all the rooms that have floor works.
Without windows and doors, if the works do not involve them.
Usually equal to the floor area.
2. Scenario: who does the work

The materials stay the same; only the labour rates change. This compares prices, not quality.

3. Floor works

The quantity of each work item = the floor area. The starting prices are for demonstration only. Replace them with your own. Prices are in your currency.

Floor works Prices per 1 m² of floor.
4. Wall works

Quantity = wall area.

Wall works Prices per 1 m² of wall.
5. Ceiling works

Quantity = ceiling area.

Ceiling works Prices per 1 m² of ceiling.
6. Works with your own quantity

You enter the quantity yourself: bathroom tiles in m², skirting boards in metres, sockets by the piece.

Works with your own quantity The quantity, and prices per one unit (the same unit for materials and labour).
7. Fixed-price packages

Work items with an all-in price: electrical work, plumbing, plans, rubbish removal. When working backwards, they are not scaled.

Fixed-price packages The price for the whole package; the material allowance only if the package includes one.
8. Contingency and budget

The contingency reserve is added to the whole cost estimate; the budget is optional, for working backwards.

Delivery, permits, plans, cleaning or anything else that does not depend on the area and is not included in the packages above.
A share of the whole cost estimate: hidden defects, changes along the way, small extras. This contingency is different from the material allowance in each work item.
Optional: the calculator shows what share of this particular set of works the amount covers, and how much is left over or missing.

How we calculate

  1. for each work item: materials = quantity × material price × (1 + material allowance); labour = quantity × rate of the chosen scenario; quantity is the floor, wall or ceiling area, your own number, or 1 for a package
  2. fixed part = other fixed costs + fixed-price packages; scalable part = the remaining works; subtotal = fixed + scalable
  3. full cost estimate = subtotal × (1 + contingency); three scenarios: the same materials and fixed costs with different labour rates
  4. share covered by the budget = (budget ÷ (1 + contingency) − fixed part) ÷ scalable part, not less than zero; not defined without scalable works

Assumptions

  • All prices are yours: from price lists, cost estimates and tradespeople’s quotes. The starting numbers are for demonstration only and are not market prices. change
  • The material allowance in each work item applies only to materials; the contingency reserve applies to the whole cost estimate. These are two different reserves.
  • The three scenarios differ only in labour rates: the materials and fixed costs are the same. A comparison of prices is not a comparison of quality.
  • When working backwards, the budget scales only the area-based works and the works with your own quantity; fixed-price packages and other fixed costs are taken in full.

Limitations

  • The calculator does not forecast market prices or inflation and does not replace a contractor’s detailed cost estimate; the work schedule and cash flow are not modelled.
  • Not assessed: the quality of the work in the different scenarios, the tax or legal status of whoever does the work, and hidden defects that come to light during the work.
  • Plans, permits, design and delivery are included only if you have entered them in the fixed costs.

Sources

A universal formula with no external constants. Default values are labelled as approximate examples, not verified facts.

Questions and answers

Why not just a “price per square metre”?

Because no such price exists: it depends on the set of works, the materials, the region, who does the work and the condition of the room. The calculator works from your numbers for each work item, so every line of the total can be checked and changed.

How is the material allowance different from the contingency reserve?

The material allowance covers cuts, breakage and leftovers in a particular work item; it increases only the cost of materials. The contingency reserve covers hidden defects and changes along the way; it is added to the whole cost estimate, including labour and fixed costs.

What does “the budget covers 163% of the scenario” mean?

That with the same set of works and prices, your budget would cover a quantity of scalable works 1.63 times as large (fixed-price packages are counted once). Below 100%, the budget is not enough for the whole cost estimate; the calculator shows separately how much is missing.

Are the starting prices market prices?

No. They are only demonstration numbers to show how the calculation works; the calculator marks them as “example”. Replace them with your own price lists, cost estimates and tradespeople’s quotes. Then the result will be about your renovation.

Related tools

This is an engineering estimate, not a guarantee: the real result depends on conditions the calculator cannot see. Check the assumptions and limitations.

Formula version renovation-cost@1.1.0 · checked 26 September 2026

Checked by the Calc editorial team: three independent implementations of the formula, test cases and the live page on a phone. Last check: 27 September 2026